Pressure Seal Group PS 100 Operator's Manual page 36

Folder and sealer
Table of Contents

Advertisement

PS 100
Replace the top-folding roller. Note that the flat faces on the two end bearings must be
held vertically for them to drop into the housing slots. Close the two snap levers to
hold the roller in place.
Replace the first and second fold plates.
Replace the top cover and restore mains power.
Reload and restart the PS100.
Figure 12: Removing the top folding roller
14-11-02 Iss. 1.
5. Operation Errors
Page 29

Advertisement

Table of Contents
loading

Related Products for Pressure Seal Group PS 100

Table of Contents