Suzuki RM-Z250 Owner's Service Manual page 199

Hide thumbs Also See for RM-Z250:
Table of Contents

Advertisement

• Fit the right crankcase cover.
• Tighten the right crankcase cover bolts to the specified torque.
! Right crankcase cover bolt: 11 N·m (1.1 kgf-m, 8.0 lb-ft)
• Install the brake pedal. ("16-18)
• Install the kick starter lever. ("8-7)
WATER PUMP CASE
• Install the dowel pins and oil filter 1.
• Apply engine coolant to the gasket 2.
• Install the gasket 2 and spring 3.
Use a new gasket to prevent engine oil/coolant leak-
age.
• Fit the water pump case.
• Tighten the water pump case bolts and drain bolt to the speci-
fied torque.
Use new gasket washer A to prevent engine coolant
leakage.
! Water pump case bolt: 11 N·m (1.1 kgf-m, 8.0 lb-ft)
Engine coolant drain bolt: 6 N·m (0.6 kgf-m, 4.5 lb-ft)
• Connect the radiator hose and pour engine coolant.
("13-3, 19-24)
INSPECTION AFTER INSTALLATION
• Engine oil level and leakage ("2-11)
• Engine coolant level and leakage ("2-15, -16)
CAUTION
CAUTION
COOLING SYSTEM
13-9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents