Suzuki RM-Z250 Owner's Service Manual page 148

Hide thumbs Also See for RM-Z250:
Table of Contents

Advertisement

9-7
GEARSHIFTING
• Apply THREAD LOCK SUPER to the pawl lifter screws and
tighten them.
# 99000-32030: THREAD LOCK SUPER "1303"
• Install the gearshift return spring C, snap ring D and washer
E to the gearshift shaft B properly.
Replace the snap ring D with a new one.
NOTE:
When installing the return spring, position the stopper D of
gearshift arm between the return spring ends E.
" 09900-06107: Snap ring pliers
• Install the gearshift shaft assembly F.
NOTE:
Pinch the gearshift arm stopper F with return spring ends G.
• Install the oil pump idle gear and primary drive gear.
(!10-17, 11-7)
• Install the magneto cover. (!14-13)
• Install the clutch component parts and right crankcase cover.
(!7-6, -7, 8-6)
• Align the matching mark on the gearshift shaft head with slit of
the gearshift lever.
• Tighten the gearshift lever bolt.
INSPECTION AFTER INSTALLATION
• Engine oil level and oil leakage (!2-11)
• Engine coolant level and coolant leakage (!2-15, -16)
• Smooth operation of gearshift system
CAUTION

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents