MDC-1840BB/1841BB/1860BB/1810BB/1820BB Series
Operation Manual
4.6.5.2 Flush mounting
Preparation:
(1) Cut aperture in surface to the dimensions shown below
(2) Mark the fixing points with a sharp-edged tool.
Figure 4.12 Dimensions of the Operation unit mounting aperture
Installation:
(1) Remove the mounting bracket from the Control Box.
(2) Remove a screw cover, which is fitted on each corner of the Control Box front
face.
(3) Put the Control Box and connecting cable into the aperture and connect the cable
to the Processor unit at the specified receptacle. (Refer to Figure 4.15)
(4) Fasten the Control Box to the panel using a 4 mm tapping-screw. (4 positions)
(5) Refit the screw covers removed in step (2).
0093142122-11
Chapter 4
Installation
4-13