Installing The Operation Unit - Koden MDC-1840BB Operation Manual

Color radar
Table of Contents

Advertisement

MDC-1840BB/1841BB/1860BB/1810BB/1820BB Series
Operation Manual
Figure 4.9 Service space required for the Processor Unit

4.6.5 Installing the Operation unit

The Operation Unit can be installed in table mount or flush mount mode.
4.6.5.1 Table mounting
(1) Remove the screw cover (4 positions) at the corner of the operation unit. To do so,
insert a thin, flat screwdriver into a gap between the cover and the operation unit.
Apply gentle pressure to gradually pry the cover off the unit. The screw cover
comes off easily by sliding it upward.
(2) Remove the mounting bracket from the operation unit by loosening the M5 screw
(4 positions).
(3) Determine the place to install the bracket and mark the point of screw. (4 positions)
(4) Put the bracket in place and fix with M5 (5 mm) tapping screw. (4 positions)
Refer to Figure 4.10 and Figure 4.11 for detail.
0093142122-11
Chapter 4
Installation
4-11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mdc-1841bbMdc-1820bbMdc-1860Mdc-1810bb

Table of Contents