Installation Of The Panel; Mains Connection - Kemppi MASTER MLS 1600 Operation Instructions Manual

Kemppi master mls 1600; mastertig mls 2000 welding machine
Table of Contents

Advertisement

1
Torch

2.5. INSTALLATION OF THE PANEL

1.
1. Fasten the cable connectors of the panel to the power source (2 pieces).
2. Place the bottom edge of the panel behind the securing clips on the machine. Remove the
fixing pin from the top edge with, for example, a screwdriver. Then gently push the upper
part of the panel into place. Make sure that the cables do not get damaged, continue gently
pushing the upper part of the panel until it clips into place. Finally, push the fixing pin back
into its place.

2.6. MAINS CONNECTION

Only an authorized electrician is allowed to install mains cable!
The power source is equipped with a 3 m mains cable with an earthed plug. The plug can be changed
only by an authorized electrician. The fuse and cable sizes are given in the chapter Technical data
in the end of this document.
This equipment's electromagnetic compatibility (EMC) is designed for use in an
industrial environment. Class A equipment is not intended for use in residential location
where the electrical power is provided by the public low-voltage supply system.
© KEMPPI OY
Rear of machine
1. Mains switch
2
2. Snap connector for gas
Installing torch cable
2.
MASTER MLS™ 1600, MASTERTIG MLS™ 2000 / 0530 – 5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mastertig mls 2000

Table of Contents