Installation Of The Panel; Mains Connection - Kemppi Master MLS 2500 Operation Instructions Manual

Hide thumbs Also See for Master MLS 2500:
Table of Contents

Advertisement

1
Torch

2.5. INSTALLATION OF THE PANEL

1.
1. Fasten the cable connectors of the function panel to the power source (2 pieces).
2. Place the bottom edge of the panel behind the securing clips on the machine. Remove the
fixing pin from the top edge with, for example, a screwdriver. Then gently push the upper
part of the panel into place. Make sure that the cables do not get damaged, continue gently
pushing the upper part of the panel until it clips into place. Finally, push the fixing pin back
into its place.

2.6. MAINS CONNECTION

Only an authorised electrician is allowed to install mains cable and plug!
The power source is equipped with a 5-meter mains cable without plug. The plug may be installed
by an authorised electrician only. The fuse and cable sizes are given in the Technical data at the
end of this manual.
This equipment's electromagnetic compatibility (EMC) is designed for use in an
industrial environment. Class A equipment is not intended for use in residential location
where the electrical power is provided by the public low-voltage supply system.
© KEMPPI OY
MASTER MLS™ 2500, 2503, 3500, 3503, MASTERTIG MLS™ 3000, 3003, 4000, 4003 / 0606– 5
Installing gas-cooled
torch
2.
Rear of machine
1. Mains switch
2. Snap connector for gas
2
Installing water-cooled torch

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents