Teac MT-20D-IO Maintenance Manual page 163

Streaming cassette magneteic tape unit
Table of Contents

Advertisement

4-3-19
Check of peak shift
(1)
Articles to be used
(a)
Work tape
(b)
SOA
(c)
DC power supply (+12 V, +5 V)
(2)
Check procedure
(a)
Connect SOA in accordance with Item 4-2-5, and set the POWER
switch to the PSA side (it is not required to connect a check
cable C).
(b)
Load the work tape on MTU.
(c)
Key in "C6".
(d)
The peak shift value is indicated to the display DATA 1 on SOA.
(e)
Check if the peak shift is less than 20%.
(f)
Key in "A21".
The write/read track of MTU is changed over to
Track 1.
(g)
Perform the same check as in steps (c) to (e).