Teac MT-20D-IO Maintenance Manual page 152

Streaming cassette magneteic tape unit
Table of Contents

Advertisement

"30 ips"
(3)
Check procedure
(a)
Connect
SOA in accordance with Item 4-2-5.
and
set
the POWER
switch to
the PSA side (it is not required to connect a check
cable C).
(b)
Load the work tape on MTU.
(c)
Key in "5".
The tape is rewound up to the BOT leader tape.
(d)
Key in "BO".
The tape is wound forward.
(e)
The start time is indicated to the display DATA 1 on SOA, and the
stop time to the DATA 2.
(f)
Check if the start time is less than 100
IDS
and the stop time is
less than 100 ms.
(g)
Key in "Bl".
The tape is wound reversely.
(h)
(i)
(j)
(k)
The
stop
Key
Key
The
start time is indicated to the display DATA
time to the DATA 2.
Make the same check as
in "80".
The tape is wound to the EOT leader
in "8Bl".
The tape is wound reversely.
start time is indicated to the display DATA
1 on SOA, and
in step
(f) .
tape.
1 on SOA. and
stop time to the DATA 2.
Make the same check as in step (f).
(1)
Key in "BO".
The tape is wound forward.
the
the
(m)
The start time is indicated to the display DATA 1 on SOA, and the
stop time to the DATA 2.
Make the same check as in step
(f).
- 4059 -

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mt-2st

Table of Contents