6
FORK, TRIPLE CLAMP
6.12.13 Adjusting the play of the steering head bearing
6.13
All SIX DAYS models
6.13.1
Performing a fork service
Preparatory work
–
Raise the motorcycle with the lift stand. (
Main work
(EXC‑F EU/AUS/BR, XCF‑W)
–
Loosen screws
–
Loosen and retighten screw
Guideline
Screw, top steering head
–
Using a plastic hammer, tap lightly on the upper triple clamp to avoid strains.
M00099-10
–
Tighten screws
Guideline
Screw, top triple clamp
–
Tighten screw
Guideline
Screw, top steering stem
(EXC-F US)
–
Loosen screws
–
Loosen and retighten screw
Guideline
Screw, top steering head
–
Using a plastic hammer, tap lightly on the upper triple clamp to avoid strains.
–
Tighten screws
M00174-10
Guideline
Screw, top triple clamp
–
Tighten screw
Guideline
Screw, top steering stem
Finishing work
–
Check the steering head bearing play. (
–
Remove the motorcycle from the lift stand. (
Condition
The fork legs have been removed.
p. 11)
and
.
.
M20x1.5
.
M8
.
M8
and
.
.
M20x1.5
.
M8
.
M8
p. 34)
12 Nm
(8.9 lbf ft)
20 Nm
(14.8 lbf ft)
20 Nm
(14.8 lbf ft)
12 Nm
(8.9 lbf ft)
20 Nm
(14.8 lbf ft)
20 Nm
(14.8 lbf ft)
p. 11)
35