Factory Pre-Set Configuration; Your Personal Configuration; Ground Fault Indication; General - Fronius IG 2000 Operating Instructions Manual

Grid-connected inverters for photovoltaic systems
Hide thumbs Also See for IG 2000:
Table of Contents

Advertisement

In case the initial operation of your FRONIUS IG unit does not proceed as
Factory pre-
set configura-
shown above and the FRONIUS IG unit does not start feeding power into
the grid, consult the chapter "Error Diagnosis and Repair".
tion
(continued)
To change your inverter settings, please consult the chapter entitled "Ope-
Your personal
configuration
rating Scheme", in the "Setup Menu" section of your operating instruc-
tions.

Ground fault indication

General

The FRONIUS IG is equipped with a ground-fault detection and interrupti-
on (GFDI) circuit as required by UL 1741 and the National Electrical code.
The array's negative conductor is connected to the grounding system in
the inverter. If a ground fault occurs in the DC cabling, the inverter discon-
nects from the grid. The fault is indicated by the red ground-fault LED and
the service code "434" is shown on the display. In this situation, the FRO-
NIUS IG is blocked from reconnection to the grid until the following ac-
tions are taken:
- Turn the AC and DC disconnect to position OFF (open-circuit)
- Remove the ground fault in your photovoltaic system
- Test the GFDI fuse and replace if necessary
WARNING! An electric shock can be fatal. Normally grounded con-
ductors may be ungrounded and energized when a ground fault is
indicated. The ground fault has to be repaired before operation is
resumed.
NOTE! When a defective fuse is changed, only replace it with a
"Littlefuse KLKD 1 AMP 600V" fuse.
-
Turn the AC and DC disconnect to position ON (closed circuit)
55

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ig 5100Ig 3000Ig 45000-lvIg 2500-lvIg 4000Ig 4500-lv

Table of Contents