First startup

Factory pre-set
The inverter has been pre-configured at the factory. The language and time must be set
configuration
during the first startup.
To change your inverter settings, please see 'The Setup Menu' section in these instruc-
tions.
First startup
Once the inverter has been connected to the solar modules (DC) and the public grid (AC),
turn the main switch to position - 1 -.
1
-
-
-
-
-
NOTE! To ensure the inverter maintains its degree of protection:
-
Insert blanking plugs into all openings at the sealing insert where there are
no cables
-
If cables are run through the sealing insert, insert the remaining blanking
plugs in the recesses located on the outside
As soon as the solar modules produce sufficient power, the Startup LED lights up or-
ange. The inverter switches to the Startup phase. The orange LED indicates that the
feed-in mode of the inverter will begin shortly.
After the automatic inverter start, the Operating Status LED lights up green.
Provided that power continues to feed into the grid, the Operating Status LED will re-
main green to confirm that the inverter is functioning correctly.
A display appears for setting the language:
Finally, the time and date must still be set:
2
1
2
3
Use the 'Up' and 'Down' keys to se-
3
lect the desired language.
Press the 'Enter' key to apply the lan-
4
guage.
53

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ig-tl 4.6Ig-tl 5.0Ig-tl 3.6Ig-tl 4.0

Table of Contents