Fronius IG 2000 Operating Instructions Manual page 20

Grid-connected inverters for photovoltaic systems
Hide thumbs Also See for IG 2000:
Table of Contents

Advertisement

Startup pha-
(2) TEST
se
(continued)
(3) Synchronisation with grid
(4) Startup test
The startup test takes five minutes. The time elapsed is indicated by
a bar shrinking from the top down.
Whenever two scale divisions stop flashing and disappear,
1/10 of the total duration of the test is over
(5) Operation of feeding energy into the grid
- self test of important components of the FRONIUS IG unit
- The FRONIUS IG unit goes through a master check list for
several seconds
- the display says "TEST" and indicates the respective compo-
nent which is being tested (for example "LED")
- "WAIT
" is displayed: The
PS
FRONIUS IG is waiting for
all power supplies in the
network to be on stand-by.
This procedure takes place
dependent on the DC-
voltage.
- The screen displays "SYN-
C
"
AC
- Before the FRONIUS IG unit starts feeding energy into the grid,
the conditions of the grid are tested in detail in accordance with
regulations.
- the screen displays "START
- After conclusion of the tests, the FRONIUS IG unit starts fee-
ding energy into the grid.
- The LED lights up green, and the FRONIUS IG unit starts ope-
rating
- "SYNC
sequently.
"
UP
12
" is displayed sub-
AC