Replacing A Faulty Psu; Notes On Psu Module Maintenance - Infortrend EonStor S12E-R1132-4 Installation And Hardware Reference Manual

Iscsi to sas/sata-ii raid subsystem
Table of Contents

Advertisement

NOTE:
A new or replaced BBU takes at most twelve (12) hours to
charge to its full capacity. Reset the subsystem whenever a
BBU is replaced or added in order for the new BBU to take
effect.
The life expectancy of a BBU is more than one year.
However, it is considered a safe procedure to replace the
BBU every year. Follow the procedures above to replace a
used BBU with a replacement in order to maintain the fault
tolerance feature.
The chance of charger failure is comparatively low. If the
cause of a failure cannot be determined even after a BBU is
replaced, contact your system vendor for a replacement
controller and return the controller module through
Infortrend's standard RMA procedure.
5.5.

Replacing a Faulty PSU

5.5.1

Notes on PSU Module Maintenance

Two (1+1) redundant PSU modules: The subsystem comes
with two fully redundant, hot-swappable PSU modules. These
modules are located at the rear section of the subsystem.
Chapter 5: Subsystem Maintenance and Upgrading
Figure 5-14: BBU LEDs on S12E-R1132-4
Figure 5-15: BBU LED on S12E-G1133-2
5-17

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eonstor s12e-g1133-2

Table of Contents