Commissioning Log - Buderus LOGANO PLUS GB312 Installation Instructions Manual

Gas condensing boiler
Table of Contents

Advertisement

7.20 Commissioning log

▶ Initial and date the commissioning steps carried out.
Commissioning operations
1.
Fill heating system and check for leaks
Heating system filling pressure
2.
Details in "Water quality requirements for Logano plus GB312"
manual taken into account
Concentration of any additives
3.
Record gas characteristics: calorific value
4.
Check gas pipe for leaks
Bleeding the gas supply pipe
5.
Bring the system up to operating pressure
6.
Check air inlet/outlet vents and flue pipe connection
7.
Checking the air inlet diaphragm
8.
Checking appliance equipment
9.
Starting up the control panel and the burner
10.
Adjust burner setting if necessary
11.
Record readings taken
Flue pressure
Flue gas temperature
Air temperature
Carbon dioxide content (CO
Carbon monoxide content (CO), without air
12.
Measuring the inlet gas pressure
13.
Checking for leaks during operation
14.
Function testing
Testing ionization current
15.
Installing outer casing panels
16.
Inform the end user and hand over
technical documentation
17.
Correct commissioning confirmed by installer
18.
Signature of operator
Table 17 Commissioning log
Logano plus GB312 – 6 720 647 367 (2012/11)
)or oxygen content (O
)
2
2
Commissioning the heating system
Page
Readings taken
____________ psi
Add.:______
Conc.:___%
42
_________ BTU/ft³
42
51
41
43
43
42
44
45
48
max. load
min. load
___in W.C.
___in W.C.
______ °F
______ °F
______ °F
______ °F
______ %
______ %
_____ ppm
_____ ppm
53
___________ in W.C.
53
52
____________ μA
54
54
Signature:__________________
Signature:__________________
7
Remarks
39