Transporting The Boiler; Lifting And Carrying The Boiler - Buderus LOGANO PLUS GB312 Installation Instructions Manual

Gas condensing boiler
Table of Contents

Advertisement

3

Transporting the boiler

This section describes how to move the boiler safely and without
damaging it.
CAUTION: Risk of system damage due to impacts.
The boiler as delivered contains components that are
sensitive to shocks.
▶ If the boiler has to be moved after delivery, protect all
components against shocks and impacts.
▶ Follow the transport instructions on the packaging.
If the boiler is not to be installed immediately, protect
the connections from entry of dirt.
Dispose of packaging in an environmentally-responsible
manner.
3.1

Lifting and carrying the boiler

CAUTION: Risk of injury through carrying heavy loads.
▶ Always lift and move the appliance with the assistance
of another person and using the grip positions shown.
▶ Secure the boiler against slipping.
The boiler can be carried to its installation site using 2 pipes
(1¼ ", approx. 80 inches long).
▶ Unscrew the locking screw from the top centre of the boiler front
panel.
▶ Lift font panel slightly and draw forwards to remove.
▶ Unscrew the locking screws from the side panels at the front and back
of the boiler.
Logano plus GB312 – 6 720 647 367 (2012/11)
▶ Slightly lift the side panels and remove.
Fig. 5 Removing front and side panels
[1]
Front cover
[2]
Side panel
[3]
Locking screw
▶ Unscrew the securing screws.
▶ Lift the boiler off the pallet.
1
Fig. 6 Lifting the boiler off the pallet.
[1]
Locking screw
[2]
Pallet
Transporting the boiler
2
7 747 010 720-06.1RS
3
1
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents