Shut down the heating system

8
Shut down the heating system
CAUTION: Risk of system damage due to freezing.
The heating system can freeze up in cold weather if it is
switched off.
▶ Protect the heating system from freezing when there
is a danger of frost. To do so, drain the water out of the
heating system from its lowest point. When doing so,
the vent at the highest point of the system must be
open.
8.1
Shutting down the heating system using the
programmer
Turn off the heating system on the Logamatic BC10 basic control unit.
When the Logamatic BC10 basic control unit is switched off, the burner
is automatically shut down at the same time. For more detailed
information about using the Logamatic BC10 basic control unit, refer to
Section 7, page 31.
▶ Switch off the heating system with the BC10 ON/OFF switch.
▶ Turn off the main isolating valve.
110
100
120
90
130
Eco
140
Aut
Fig. 51 Logamatic BC10 basic controller
8.2
Heating system in an Shutting down the boiler in an

emergency

The circuit-breaker for the boiler room or the heating
emergency stop switch should only be used to switch off
the heating system in an emergency.

8.2.1 Action in an emergency

Explain to the customer what to do in an emergency, e.g. a fire.
▶ Never risk your own life. Your own safety must always take the highest
priority.
▶ Turn off the main isolating valve.
▶ Disconnect the heating system from the electrical power supply by
means of the emergency shutoff switch or the appropriate circuit
breaker.
40
130
110
150
90
170
190
Aut
7 747 010 720-38.2RS
9

Heating system inspection

Heating systems should be regularly maintained for the following
reasons:
• to achieve a high level of efficiency and to operate the system
economically (low fuel consumption),
• to achieve a high level of operational safety,
• to maintain the cleanest possible combustion
• to ensure reliable operation and a long service life.
Servicing work may only be carried out by a qualified service
technician. If parts are replaced, only Buderus-approved
components may be used. Maintenance must be carried out once a
year. The results of the inspection must be recorded in the
inspection and maintenance log.
Spare parts can be ordered from Buderus using the parts
list.
9.1

Preparing the boiler for inspection

DANGER: Risk of fatal injury from electric current.
▶ Before opening up the boiler, isolate it completely
from the mains power supply and ensure the power
cannot be inadvertently reconnected.
▶ Shut down the heating system.
▶ Unscrew the securing screw from the top centre of the boiler front
panel.
▶ Lift font panel slightly and draw forwards to remove.
DANGER: Risk of fatal injury from the explosion of
flammable gases.
▶ Operations on the gas pipes may only be carried out
by a properly licensed gas contractor.
Fig. 52 Removing the front panel
[1]
Screw