Notes On Installation And Operation; Other Important Information; Heating System Water Quåality; Tools, Materials And Equipment - Buderus LOGANO PLUS GB312 Installation Instructions Manual

Gas condensing boiler
Table of Contents

Advertisement

2. APPROVED CARBON MONOXIDE DETECTORS
Each carbon monoxide detector as required in accordance with the
above provisions shall comply with NFPA 720 and be ANSI/UL 2034
listed and IAS certified.
3. SIGNAGE
A metal or plastic identification plate shall be permanently mounted to
the exterior of the building at a minimum height of eight (8) feet above
grade directly in line with the exhaust vent terminal for the horizontally
vented gas fueled heating appliance or equipment. The sign shall read,
in print size no less than one-half (1/2) inch in size, "GAS VENT
DIRECTLY BELOW SIGN. KEEP CLEAR OF ALL OBSTRUCTIONS".
4. INSPECTION
The state or local gas inspector of the side wall horizontally vented gas
fueled equipment shall not approve the installation unless, upon
inspections, the inspector observes carbon monoxide detectors and
signage installed in accordance with the provisions of
248 CMR 5.08(2)(a)1 through 4.
A product-approved vent terminal must be used, and if applicable, a
product-approved air intake must be used. Installation shall be in strict
compliance with the manufacturer's instructions. A copy of the
installation instructions shall remain with the boiler or equipment at the
completion of the installation.
2.4

Notes on installation and operation

When installing and operating the heating system observe the following:
• The local building regulations regarding the installation conditions.
• The local building regulations regarding ventilation air and extract air
facilities, and the chimney connection.
• Electrical code requirements for connection to the power supply.
• The technical regulations of the gas company regarding the
connection of the gas burner to the local main gas supply.
• The regulations and standards relating to the safety of DHW heating
system.

2.4.1 Other important information

• The installation of a boiler must be notified to and approved by the
relevant gas utility company.
• Only operate the boiler with the combined air/flue system specifically
designed and approved for it.
• Remember that regional approvals are required for the flue system
and connecting the condensate outlet to the public sewer system.
If a high limit safety cut-out is installed according to
ASME-CSD1 on the flow piece of the (B-kit), heed the
following:
▶ At the plant, a pump post purge time of 5 minutes is
set on the BC10 controls. This value can be increased
but not reduced.
▶ If an external controller controls the recirculation
pump, a pump post purge time of 5 minutes must be
ensured.
Logano plus GB312 – 6 720 647 367 (2012/11)
2.5
Heating system water quality
As pure water cannot be used for heat transfer, water quality is
important. Poor water quality can damage heating systems due to
scale formation and corrosion. For further details, please see the
accompanying "Water quality requirements for Logano plus
GB312" manual.
CAUTION: Risk of system damage due to unsuitable
heating system water.
▶ When using oxygen-permeable pipes, e. g. for radiant
floor heating systems, you must separate the system
using heat exchangers. Unsuitable heating system
water promotes sludge and corrosion formation. This
can result in heat exchanger malfunction and damage.
2.6

Tools, materials and equipment

For the installation and maintenance of the boiler, you will require the
standard tools used for central heating and gas and water systems plus
set of a metric wrenches and hex keys.
The following items are also of use:
• The RC35 programming unit is required as a monitoring device for
commissioning, servicing and maintaining the boiler.
A PC with Buderus Logamatic ECO-Soft 4000/EMS and
a service key can also be used as a monitoring device.
• 2 pipes (approx. 1¼ ", approx. 6.6 ft long) for carrying the boiler or 5
pipes (approx. 1¼ ", approx. 28 ins long) for placing underneath the
boiler to act as rollers
• Cleaning blade and/or chemical cleaning agent for wet cleaning
2.7

Disposal

▶ Dispose of boiler packaging in an environmentally-responsible
manner.
▶ All heating system components that have to be replaced should be
disposed of in environmentally-responsible manner at an authorized
disposal site.
2
Product description
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents