6.8

Commissioning log

Please check off the commissioning work as it is
completed and record the measured values in the table.
Commissioning operations
1.
Type of gas supply
2.
Check combustion air, inlet and outlet openings and flue
3.
Check the appliance orifices (correct nozzles
necessary adjust gas type.
4.
Fill boiler with water and bleed complete heating system
5.
Measure gas supply pressure [inches W.C.] or [mbar]
6.
Measure nozzle pressure and adjust if necessary [inches W.C.]
or [mbar]
7.
Leak test in operating status
Check of the ignition flame
Check of the main burner flame
Check of the perfect function of the venting system
8.
Check maximum aquastat setting
9.
Install front wall of boiler
10.
Inform operator, hand over technical documentation
11.
Installer:
Operator:
Main gas orifice identification of the main gas nozzles (0 - 2000 ft / 0 - 610 m)
Boiler capacity
1)
Natural gas
Only convert natural
2)
gas
Tab. 12 Main gas orifice identification
1) factory setting
2) to propane gas according to conversion instructions
Logano G234X - Technical specifications are subject to change without prior notice.
Tab. 12), if
38
45
3.70
3.70
2.20
2.40
Commissioning the heating system
Comments or measured
Page
value
Natural
Gas
page 23
page 35
page 21
page 31
Measurement
value:__________ Unit_____
page 31
Measurement
value:__________ Unit_____
page 28
page 32
page 32
page 33
page 34
page 34
Signature:_________________
Signature:_________________
55
3.50
2.30
6
Propane Gas
64
3.80
2.45
35