9.8

Checking for leaks during normal operation

CAUTION: Risk of system damage due to short-circuits.
▶ Cover the fan and other at-risk areas before searching
for leaks.
▶ Do not spray leak detector onto cable conduits, plugs
or electrical connecting leads. Do not let it drip onto
them either.
▶ Start up the boiler and check the flange for leaks at maximum output.
▶ Check all around the flange for leaks using a leak detecting agent.
▶ For details of other leakage checks, refer to Section 7.17, page 38.
9.9

Testing ionization current

To ensure trouble-free operation, the ionization current at medium and
maximum output (when flame is lit) should be at least 3 μA.
The (flame) ionization current can be read off on the RC35 programming
unit under "SERVICE MENU DIAGNOSIS/MONITOR READING"
( Section 7.15.1, page 37).
A PC with Logamatic ECO -Soft4000/EMS software and
a service key can also be used as a monitoring device.
Please contact Buderus for more detailed information.

9.10 Concluding servicing/maintenace

9.10.1 Removing instruments

Follow the instruction manuals for the BC10 and RC35.
If you are not using an RC35 programming unit for the boiler, please note
the following when concluding the servicing/maintenance procedure:
▶ Remove the RC35 programming unit.
▶ If a Logamatic 4000 control system is connected to the boiler, it can
be switched on after the RC35 programming unit has been removed.

9.10.2 Installing outer casing panels

▶ Refit outer casing panels ( Fig. 50, page 38).

9.10.3 Confirming servicing/maintenance

▶ Sign the servicing and maintenance log in this manual
( Section 9.11, page 50).