Transporting the boiler
▶ Push the pipes through the holes at the front and rear of the boiler
( Fig. 7).
▶ Secure the pipes against slipping in the positions shown in Fig. 7,
using adhesive tape for example.
▶ Carry the boiler to the installation site.
Fig. 7 Transporting the boiler using pipes
[1]
Positions for securing the boiler against slipping
[2]
Pipe (for carrying)
14
3.2

Transporting the boiler on rollers

If the route to the installation site is flat, the boiler can also be rolled. This
requires at least 5 lengths of pipe approx. 28 inches long (diameter
1¼ ") to be placed underneath to act as rollers.
▶ Lay the lengths of pipe on the floor spaced about 16 inches apart.
▶ Lift the boiler onto the lengths of pipe and carefully transport it to the
boiler room.
7 747 010 720-07.1RS
Fig. 8 Transporting the boiler on rollers (dimensions in inches)
You can also use standard transport rollers.
▶ So that the bottom plate is not pressed in, it is
essential to ensure that the weight is evenly
distributed across the load-bearing parts.
Logano plus GB312 – 6 720 647 367 (2012/11)
7 747 010 720-08.1RS