Precor P30 Operating And Maintaining page 79

Hide thumbs Also See for P30:
Table of Contents

Advertisement

Assembling the AMT
13. Repeat the previous two steps for the left side arm.
After the side arm supports are secured, move the AMT off of
its shipping pallet to the location where you intend it to be
used.
CAUTION: Do not move the AMT off of its shipping pallet without
assistance. Do not apply any weight or other force to the side
arms of the AMT until the side arm supports have been installed.
To avoid unnecessary movement of the foot plates, do not
position the handlebars until instructed to do so.
To move the AMT from the pallet to its intended location:
1.
2. Lift the back end of the center support and roll the AMT
3. Move the AMT ahead to its intended location.
4. Insert the end caps into the front frame tube. If necessary,
Remove and discard the two fasteners securing the front
frame tube of the AMT to the shipping pallet, as shown in
the following figure.
Figure 9: Front pallet anchor locations
forward while your assistant stabilizes its front end and
guides it off the shipping pallet onto the floor.
use a rubber mallet to tap them into place.
25

Advertisement

Table of Contents
loading

Table of Contents