Changing Synchronization Settings
To change Synchronization settings:
1. Click on the Background Activities icon.
2. Click the Settings button.
3. Click the Background Synchronization Rate drop-down menu and choose a rate:
• Low: Fewer system resources are available to Synchronization, leaving more
resources for data read/write operations.
• Medium: Balances system resources between Synchronization and data read/
write operations.
• High: More system resources are available to Synchronization and fewer for
data read/write operations.
4. Click the Confirm button.
5. Click the X icon to close the background activities panel.
Managing Physical Drives
Physical drive management includes:
• "Viewing a List of Physical Drives"
• "Viewing Physical Drive Information"
• "Viewing Physical Drive Statistics"
• "Viewing Physical Drive SMART Log Information"
• "Locating a Physical Drive"
• "Making Global Physical Drive Settings"
• "Making Individual Physical Drive Settings"
• "Making Physical Drive SMART Log Settings"
• "Clearing a Stale or a PFA Condition"
• "Forcing a Physical Drive Offline"
Configuring G-SPEED Studio R
p. 55