Viewing Scheduled Background Activities; Adding A Scheduled Background Activity - G-Technology G Speed studio Product Manual

High-performance 4 bay thunderbolt 2 raid solutions for hd 2k/4k production
Hide thumbs Also See for G Speed studio:
Table of Contents

Advertisement

Viewing Scheduled Background Activities

To view a list of scheduled background activities:
1. Click on the Background Activities icon.
2. Click the Scheduler button. The list of scheduled background activities will appear.

Adding a Scheduled Background Activity

To add a new scheduled background activity:
1. Click on the Background Activities icon.
2. Click the Scheduler button. The list of scheduled background activities will appear.
3. Click the Add Schedule button.
4. Make schedule settings as desired.
Choose the option for the activity you want:
• Media Patrol
• Redundancy Check
• Spare Check
Choose a Start Time from the drop-down menus.
The menus have a 24-hour clock.
Choose a Recurrence Pattern option: daily, weekly or monthly.
• For the Daily option, enter an interval in the Every field.
• For the Weekly option, enter an interval in the Every field and choose one or more
days of the week.
• For the Monthly option, choose the Day of the Month option or a sequential and
specific day from the drop-down menu. Also choose which months should apply.
Choose a Start From date from the drop-down menus.
Configuring G-SPEED Studio R
p. 44

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

G speed studio with thunderbolt

Table of Contents