Control Box Installation - Viking X-9 Installation Instructions And Safety Information

Vehicular gate operator ul 325 and ul991 listed class i, class ii, class iii and class iv
Table of Contents

Advertisement

CONTROL BOX INSTALLATION

CONTROL BOX INSTALLATION
WARNING - If the control box is not mounted properly it may fall, causing damage
and/or injury. The control box weight is approximately 40 lbs. Be sure that the
substrate being mounted to and the fasteners being used are appropriate to
support the weight of the control box.
1. Remove the control board mounting plate.
The plate is held in the box by four
screws.
2. Position the control box in the desired
place and mark the mounting holes.
Prepare the holes to receive the
anchors/fasteners.
3. Position the control box and secure it to
the mounting surface using the sealed
washers provided (place the rubber side
of the washers against the inside of the
control box).
Note: Depending on type of anchor used, it
may be necessary to enlarge the
mounting holes in the control box.
16
TECHNICAL SUPPORT 1 800 908 0884
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents