Plan Of Installation - Open Inside - Viking X-9 Installation Instructions And Safety Information

Vehicular gate operator ul 325 and ul991 listed class i, class ii, class iii and class iv
Table of Contents

Advertisement

PLAN OF INSTALLATION - OPEN INSIDE

PLAN OF INSTALLATION - OPEN INSIDE
The gate must be installed in a location so that enough clearance is supplied
between the gate and adjacent structures when opening and closing to reduce the
risk of entrapment.
Swinging gates shall not open into public access areas.
Outside
Gate in Closed Position
Inside
Outside
Gate in Closed Position
Inside
Note: Varying from the dimensions shown
may severely affect the speed and
performance of the gate operator.
10
C:
23-1/2"
A: 15-3/4" Max.
90°
Figure A
7-1/4"
Max.
C:
19-1/2"
Figure B
Open Inside Plans of Installation
TECHNICAL SUPPORT 1 800 908 0884
G:
4.33"
Ref.
H:
2.55"
Ref.
B:
4-3/4"
Min.
F:
14-1/2"
Min.
Gate in Open Position
B:
G:
4-3/4"
4.33"
Min.
Ref.
H:
2.55"
Ref.
F:
14-1/2"
Min.
Gate in Open Position

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents