Site Requirements

Before you begin, make certain that your installation site meets the requirements
discussed in this section.

Access Requirements

WARNING:
Use this product in locations that restrict access to all persons who are not
authorized. Otherwise, personal injury or equipment damage may occur.
Ensure that only authorized personnel have access to this equipment. Otherwise,
personal injury or equipment damage may occur.

Equipment Rack

To install this module, your site must be equipped with an Electronics Industry
Association (EIA) equipment rack that properly houses the chassis with proper
spacing for air circulation. For instructions on installing the chassis in the rack, refer
to the guide that was shipped with the chassis.

Operating Environment

CAUTION:
Avoid damage to this product! Operating this product outside the specified
operating temperature limits voids the warranty.
Follow these recommendations to maintain an acceptable operating temperature of
the equipment.
Temperature at the air inlet must be between -40°C and 65°C (-40°F and 149°F).
Keep cooling vents clear and free of obstructions.
Provide ventilation as needed using air-deflecting baffles, forced-air ventilation,
or air outlets above enclosures, either alone or in combination.

Power Requirements

All Prisma II application modules receive their electrical power from the chassis. The
modules may be installed with the chassis under power.