Olivetti d-Copia 300 Service Manual page 51

Hide thumbs Also See for d-Copia 300:
Table of Contents

Advertisement

2FD/2FF/2FG
18. Slightly lift the bottom of the finisher and
insert the rail fixing plate into the finisher, and
then join them by inserting two M4 × 6
binding screws loosely.
19. Insert the guide rail into the rail fixing plate
and secure it using an M4 × 6 binding screw
at the position where the screw hole in it and
that in the rail fixing plate meet.
Note: When installing the switchback unit,
use screw hole a in the guide rail; when not
installing the switchback unit, use screw
hole b in the guide rail.
20. Adjust the position of the rail fixing plate so
that the gap between the plate and the floor is
approximately 8.0 mm, and then tighten the
two loosely fitted M4 × 6 binding screws.
1-3-26
Rail fixing plate
M4 × 6
binding screw
Rail fixing plate
Guide rail
Finisher
Rail fixing plate
M4 × 6
binding screws
Figure 1-3-52
Screw hole a
Screw hole b
Figure 1-3-53
M4 × 6
binding screws
Rail fixing plate
8.0 mm
M4 × 6
binding screws
Figure 1-3-54

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

D-copia 400D-copia 500

Table of Contents