Sealing Floor Front - All Installations - Valor Dream 2 Installer's Manual

Inset live fuel effect gas fire
Hide thumbs Also See for Dream 2:
Table of Contents

Advertisement

Inspect the installation of the convection
12.
box against the fireplace surround. If the
convection box is aligned squarely and the
sealing is satisfactory, fully tighten the cable
retainers.
If the convection box is not correctly
13.
aligned, release the tension on the cables by
slackening the screws and turning the
hexagonal adjusters fully anticlockwise. The
convection box should then automatically
realign itself. Pull each cable taut again and
push the cable retainers back against the "V"
brackets. Again, tighten the screws in the
retainers and apply tension to the cables by
turning the hexagonal
adjusters clockwise as far as possible.
Underneath the 'V' shaped brackets is a hole. Feed the free length of the cables into
14.
these holes so that they are available to allow easy removal and refitting of the appliance
during subsequent service calls. Do not cut off the free lengths of cable
8.3

Sealing Floor Front - All installations

Using the floor sealing tape supplied, seal the bottom of the convection box to the
fireplace and hearth floor - See figure 22.
Make sure that the whole length of the front edge of the convection box is fully
sealed.
INSTALLER'S GUIDE
Page 24
Figure 22. Floor Sealing

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dream 2 641

Table of Contents