Sealing Floor Front; Burner, Front Surround& Supply Pipe Installation; Burner & Supply Pipe Installation; Preliminary Burner Checks - Valor BR417 VA Installer's Manual

Inset live fuel effect gas fire with ultimate front
Hide thumbs Also See for BR417 VA:
Table of Contents

Advertisement

8.3 Sealing Floor Front

All installations
Using the floor sealing tape
supplied, seal the bottom of the
convection box to the fireplace and
hearth floor. Run the tape over the
burner fixing bracket. See figure 16.
9 B U R N E R , F R O N T S U R R O U N D
& S U P P L Y P I P E I N S T A L L A T I O N
9.1 Burner & Supply Pipe Installation
1. Refit the burner unit to the convection box with three screws.
2. Locate the two lugs at the top of the front surround in the slots in the convection box
hood. Swing the bottom of the surround sides back against the convection box and lower
the surround so that the lugs are fully seated in the slots in the convection box hood.
3. Refit the two screws to secure the surround sides to the convection box brackets.
4. Connect the supply line to the appliance.
For right hand side connection: The supply pipe will have to be formed to go behind the
control knob and burner support bracket. The installation template contains a diagram for
bending this supply pipe.
5. Pressure check the installation pipework for gas soundness. In the United Kingdom
check in accordance with the current edition of BS6891. In the Republic of Ireland check
in accordance with the rules in force. A long brush may be required to reach some joints

9.2 Preliminary Burner Checks

Some burner operations can be checked at this stage. Checking now will mean that less
disassembly will be required if any problems are found. A full check should still be
made, however, after final installation
1. If closed
open the isolating valve at the inlet elbow.
,
2. Depress the control knob and turn anticlockwise partially towards the "PILOT/IGN"
position until some resistance is felt. Keep depressed at this position to purge air from the
system then, while keeping it depressed, turn fully to the "PILOT/IGN" position. A spark
should be generated at the pilot while turning. The spark should ignite the pilot
3. When pilot ignition has been achieved, keep the control knob depressed for
approximately ten seconds to allow the thermocouple probe to warm up and then release
INSTALLER'S GUIDE
Figure 16. Floor sealing
Page 18
.
.

Advertisement

Table of Contents
loading

Table of Contents