16Servicing & Parts Replacement; Checking The Aeration Setting Of The Burner - Valor Dream 2 Installer's Manual

Inset live fuel effect gas fire
Hide thumbs Also See for Dream 2:
Table of Contents

Advertisement

1 6 S E R V I C I N G & P A R T S R E P L A C E M E N T
Always turn off the gas supply before commencing any servicing (The appliance
inlet "T" connector incorporates an isolating valve).
It is recommended that, at least once a year, the appliance is disconnected and the
fireplace opening checked and cleared of any debris.
This product uses fuel effect pieces, burner compartment walls and gaskets
containing Refractory Ceramic Fibres (RCF), which are man-made vitreous silicate
fibres. Excessive exposure to these materials may cause irritation to eyes, skin and
respiratory tract. Consequently, it is important to take care when handling these
articles to ensure that the release of dust is kept to a minimum. To ensure that the
release of fibres from these RCF articles is kept to a minimum, during installation
and servicing we recommend that you use a HEPA filtered vacuum to remove any
dust and soot accumulated in and around the fire before and after working on the
fire. When replacing these articles we recommend that the replaced items are not
broken up, but are sealed within a heavy duty polythene bag, clearly labelled as
RCF waste. This is not classified as "hazardous waste" and may be disposed of at a
tipping site licensed for the disposal of industrial waste. Protective clothing is not
required when handling these articles, but we recommend you follow the normal
hygiene rules of not smoking, eating or drinking in the work area and always wash
your hands before eating or drinking.
16.1 Checking the aeration setting of the
burner.
• The aeration collar is factory set. If
the gap at the rear of the mixer tube is
different to that shown in figure 48 see
below.
• The aeration collar should be
positioned so that the opening in the
rear of the mixer tube is partially
closed. Slide the aeration collar
towards the injector as far as it will go.
The gap should be 4mm (See figure
48).
INSTALLER'S GUIDE
Page 39
Figure 48 Aeration collar setting.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dream 2 641

Table of Contents