Sealing Floor Front - Valor British Gas BG C-2 Installer's Manual

Inset live fuel effect gas fire
Hide thumbs Also See for British Gas BG C-2:
Table of Contents

Advertisement

Fit a cable retainer over the bottom end
of each cable.
7. Pull each cable taut. Push the cable
retainers hard up against the "V"
brackets. Tighten the screws in the
retainers so that they clamp the cables
in position. Apply tension to the cables
by turning the hexagonal adjusters by
hand. See figure 18.
8. Drill a hole into the fireplace floor
through each of the two holes in the
base of the convection box using a no.12
masonry drill. See figure 19.
9. Insert a fibre plug into each hole. Use
the rawlplugs supplied with this appliance -
Never use plastic plugs instead of the
fibre plugs supplied. Fit a woodscrew in
each plug and tighten.
10.
Inspect the installation of the
convection box against the fireplace
surround. If the convection box is aligned
squarely and the sealing is satisfactory,
fully tighten the cable retainers.
11.
If the convection box is not
correctly aligned, release the tension on
the cables by slackening the screws and
turning the hexagonal adjusters fully
anticlockwise. The convection box should
then automatically realign itself. Pull each cable taut again and push the cable retainers
back against the "V" brackets. Again, tighten the screws in the retainers and apply tension
to the cables by turning the hexagonal adjusters clockwise as far as possible.
12.
Insert the free length of the cables through the holes in the convection box flanges
(located inside the lower case fixing brackets) so that they are pushed into the fireplace
cavity. This will allow easy removal and refitting of the appliance during subsequent
service calls.

10.3 Sealing Floor Front

All installations
Using the floor sealing tape supplied, seal the bottom of the convection box to the
fireplace and hearth floor. Run the tape over the burner fixing bracket. See figure 20.
INSTALLER'S GUIDE
Page 18
Figure 18 Lower cable retaining
Figure 19 Floor fixings
Figure 20. Floor sealing

Advertisement

Table of Contents
loading

Table of Contents