Sun Microsystems Sun Workstation 100U System Manager's Manual page 20

Table of Contents

Advertisement

Unpacking and Setting up the 100U
Sun 100/150 Installation Manual
material. Remove these items.
4. Lift out the rubber and styrofoam packing material (the fit is fairly tight; try rocking it
out). At this point you may find a mouse and mouse pad tucked along the side of the moni-
tor; if you ordered an 84-MByte disk subsystem, these will be packed with it instead.
5. Remove the square 'tube' from its bottom lid. Don't try to lift the Sun Workstation out of
the shipping carton: it's too heavy. When you remove the 'tube' from the bottom lid, the
workstation is left standing in the bottom piece of packing material. You can then lift the
workstation out of the bottom shipping material, remove the plastic wrapping, and place the
workstation on its working surface.
We recommend that you save the salvageable shipping cartons and packing material for future
use in case the product must be reshipped.
1.4. Set-up
The following subsections describe how to cable up your Sun Model 100U and its basic peri-
pherals~
CA UTlON: Before plugging in the power cord of any component of your Sun system, be sure
that the line power supply voltage and frequency are as specified on the back panel of your
workstation. Use only three-prong (grounded) outlets.
Always disconnect
power before opening
any system enclosure or servicing any system component. All servicing should be performed by
qualified personnel.
1-4
Revision H of 12 March 1984

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sun workstation 150u

Table of Contents