Installing The Etu In The Electra Elite Ksu - NEC Electra Elite IPK Installation And Maintenance Manual

Etu with megaco station package
Hide thumbs Also See for Electra Elite IPK:
Table of Contents

Advertisement

Document Revision 4
___________________________________________________________________________________
2.2
To install the ETU:
1.
2.
___________________________________________________________________________________
E - 2
I
ETU
NSTALLING THE
When the IAD(8)-U( ) ETU is used for the Megaco station application, this
ETU is assigned in the Electra Elite IPK system as an ESI(8)-U( ) ETU. This
ETU has eight ports, and installed in slots S1~S8 of the Electra Elite IPK KSU.
Insert the IAD(8)-U( ) ETU in to any slot in the KSU. Make sure that all the
switches in S2 are set to the ON position (factory default).
Once the LEDs CH 8(D1) and CH7(D3) are lit SOLID and the Status LED (D12)
is flashing red, connect your cross over cable or hub to Ethernet connector (J6)
on the IAD(8)-U( ) ETU. The IAD(8)-U( ) is ready to install your IP Application
package.
E
E
IN THE
LECTRA
LITE
Figure E-1 IAD (8)-U( ) ETU
Electra Elite IPK IAD(8)-U( ) ETU Installation
MEGACO Station
KSU

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Electra elite ipk iad(8)-u series

Table of Contents