• Run the cable though a conduit if possible, but not through a conduit
containing any power wiring.
• Route the other end to the probe at the battery and coil up excess cable.
If the standard (25ft / 7.6m) cable is not long enough, longer cable
assemblies are available in lengths of 50, 100 & 200ft / 15.2, 30.5 &
61.0m. See Appendix B on page 65 for ordering information.
• Make sure wiring conforms to NEC, local, and site requirements.
5. Attach the interconnection cable to the AT30 as shown in the figure below:
• Route the
cable within
the AT30
enclosure so it
runs with the
wire harness
to the back of
the front
panel, and
easily reaches
the Main
Control PC
Board (A1).
• At the Main Control PC Board (A1), insert one of the bare wires from
the cable into each terminal of TB8. Polarity is not vital.
• Plug the connector at the end of the nylon-shielded wire of the cable
assembly onto J6.
• Using plastic wire ties, fasten the interconnection cable loosely to the
existing wire harness. Make sure that the cable conforms to the service
loop at the hinge end of the door.
6. At the battery, connect the quick-connect terminals to the temperature
compensation probe. Polarity is not vital. Coil up any excess wire and tape
or tie it together to prevent damage.
7. Set jumper (J30) on the Main Control PC Board (A1) to positions 2-3 to use
compensated voltages, or to positions 1-2 to use uncompensated voltages.
INSTALLING THE AT30