Eaton BladeUPS Installation Manual page 25

Eaton powerware series bladeups bar installation guide
Hide thumbs Also See for BladeUPS:
Table of Contents

Advertisement

15. BladeUPS Bar 4-High. Install two M6 12 hex bolts in each of the
16. BladeUPS Bar 6-High. Install two M6 12 hex bolts in each of the
17. Install an M4 8 pan-head screw to secure the wireway top panel
M4
8
Pan-Head Screw
Eaton BladeUPS Bar Installation Guide
bar's two mounting brackets, securing the length of the bar to the
rack. See Figure 16. Torque the bolts to 5.1 ± 0.8 Nm (45 ± 7 lb in).
bar's three mounting brackets, securing the length of the bar to the
rack. See Figure 16. Torque the bolts to 5.1 ± 0.8 Nm (45 ± 7 lb in).
to the bar. See Figure 16.
Rear of Rack
Figure 16. Bar Brackets Installation
S
164201723 Rev 2 www.eaton.com/powerquality
INSTALLATION
M6
12 Hex Bolts through
Rack to Terminal Block
Assembly Bracket (3 places)
Terminal Block Assembly
Bracket Stud (at position
14 from top)
Bar
M6
12 Hex Bolts (2 places)
per Mounting Bracket
NOTE One mounting
bracket shown.
Front of Rack
21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powerware bladeups

Table of Contents