Eaton BladeUPS Installation Manual page 24

Eaton powerware series bladeups bar installation guide
Hide thumbs Also See for BladeUPS:
Table of Contents

Advertisement

INSTALLATION
M6
12 Hex Bolts
Terminal Block
Assembly Bracket
20
Eaton BladeUPS Bar Installation Guide
12. Secure the bar to the wireway with three M6 12 hex bolts. Install
the bolts from the front of the rack. See Figure 15. Torque the bolts
to 5.1 ± 0.8 Nm (45 ± 7 lb in).
13. Reinstall the terminal block assembly bracket removed in Step 10.
Install the bolts from the front of the rack. See Figure 15. Torque the
bolts to 5.1 ± 0.8 Nm (45 ± 7 lb in).
NOTE Do not change the original orientation of the terminal block assembly bracket. Verify
that the threaded holes mount to the rack, not to the bar.
(3 places)
Rear of Rack
Figure 15. Terminal Block Assembly Installation
14. Secure the terminal block assembly bracket to the rack with three
M6 12 hex bolts. Install the bolts from the rear of the rack.
Use a large screwdriver or crowbar to lift the bar in place to align
the holes in the terminal block assembly bracket with the holes in
the rack.
Install the highest bolt in position 5 from the top, then use positions
11 and 17. Verify that the terminal block assembly bracket stud
aligns completely with the rack hole between the lower and middle
bolts (position 14). See Figure 16. Torque the bolts to 5.1 ± 0.8 Nm
(45 ± 7 lb in).
S
164201723 Rev 2 www.eaton.com/powerquality
Front of Rack

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powerware bladeups

Table of Contents