Eaton BladeUPS Installation Manual page 16

Eaton powerware series bladeups bar installation guide
Hide thumbs Also See for BladeUPS:
Table of Contents

Advertisement

INSTALLATION
Bar
M4
8
Pan-Head
Screw
Rear of Rack
12
Eaton BladeUPS Bar Installation Guide
15. BladeUPS Bar 4-High. Install two M6 12 hex bolts in each of the
bar's two mounting brackets, securing the length of the bar to the
rack. See Figure 6. Torque the bolts to 5.1 ± 0.8 Nm (45 ± 7 lb in).
16. BladeUPS Bar 6-High. Install two M6 12 hex bolts in each of the
bar's three mounting brackets, securing the length of the bar to the
rack. See Figure 6. Torque the bolts to 5.1 ± 0.8 Nm (45 ± 7 lb in).
17. Install an M4 8 pan-head screw to secure the wireway top panel
to the bar. See Figure 6.
Figure 6. Bar Brackets Installation
S
164201723 Rev 2 www.eaton.com/powerquality
Front of Rack
M6
12 Hex Bolts
(2 places) per
Mounting Bracket
NOTE One mounting
bracket shown.
M6
12 Hex Bolts
through Rack to
Terminal Block
Assembly Bracket
(3 places)
Terminal Block
Assembly Bracket
Stud (at position 5)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powerware bladeups

Table of Contents