Eaton BladeUPS Installation Manual page 19

Eaton powerware series bladeups bar installation guide
Hide thumbs Also See for BladeUPS:
Table of Contents

Advertisement

22. Using four M5 16 hex bolts and four M5 cage nuts, secure the
front cover mounting panel to the front of the rack. Ensure that the
bent edge of the panel is at the top. See Figure 10.
Install the lower bolts and cage nuts into the second holes from the
bottom of the rack frame. Torque the bolts to 5.1 ± 0.8 Nm
(45 ± 7 lb in).
Figure 10. Front Cover Mounting Panel Installation
Eaton BladeUPS Bar Installation Guide
Bent Edge of Panel
Front of Rack
S
164201723 Rev 2 www.eaton.com/powerquality
INSTALLATION
M5
16 Hex Bolts
and M5 Cage Nuts
(4 places)
Front Cover
Mounting Panel
15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powerware bladeups

Table of Contents