Eaton BladeUPS Installation Manual page 23

Eaton powerware series bladeups bar installation guide
Hide thumbs Also See for BladeUPS:
Table of Contents

Advertisement

M6 Hex Nuts on
Wireway Studs (3 places)
Ferrite Assembly (secured to
wireway floor with tie wrap)
Eaton BladeUPS Bar Installation Guide
11. Place the bar in the rack as shown in Figure 14.
NOTE The bar can rest on a support until secured in place. After complete installation, the
bar will be secured to the rack and wireway as shown in Figure 14.
Front of Rack
Figure 14. Ferrite and Bar Placement
NOTE Verify that the bar is secure as shown in Figure 14. The sheetmetal at the top and
bottom of the of the terminal block assembly should fit between the wireway tabs.
Rear of Rack
S
164201723 Rev 2 www.eaton.com/powerquality
INSTALLATION
Wireway Tabs
Bar
19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powerware bladeups

Table of Contents