Eaton BladeUPS Installation Manual page 15

Eaton powerware series bladeups bar installation guide
Hide thumbs Also See for BladeUPS:
Table of Contents

Advertisement

INSTALLATION
14. Secure the terminal block assembly bracket to the rack with three
M6 12 hex bolts. Install the bolts from the rear of the rack.
Use a large screwdriver or crowbar to lift the bar in place to align
the holes in the terminal block assembly bracket with the holes in
the rack.
Install the lowest bolt in position 2, then use positions 8 and 14.
Verify that the terminal block assembly bracket stud aligns
completely with the rack hole between the lower and middle bolts
(position 5). See Figure 6. Torque the bolts to 5.1 ± 0.8 Nm
(45 ± 7 lb in).
S
164201723 Rev 2 www.eaton.com/powerquality
11
Eaton BladeUPS Bar Installation Guide

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powerware bladeups

Table of Contents