NOTE Loosening the mounting brackets slightly may allow easier alignment to the vertical
rail of the rack. Retighten the mounting brackets when alignment is complete.
18. Using two M6 12 hex bolts, secure the left side of the wireway
terminal block housing to the rack. See Figure 7. Torque the bolts to
5.1 ± 0.8 Nm (45 ± 7 lb in).
19. Using six M4 8 pan-head screws, secure the wireway terminal
block housing to the wireway and to the bar. See Figure 7. Torque
the screws to 1.7 ± 0.2 Nm (15 ± 2 lb in).
Front of Rack
M6
12 Hex Bolts
(2 places)
Figure 7. Wireway Terminal Block Housing Installation
Eaton BladeUPS Bar Installation Guide
OUTPUT
A
INPUT
OUTPUT
A
B
INPUT
OUTPUT
B
C
INPUT
C
NEUTRAL
M4
8 Pan-Head Screws
(6 places)
S
164201723 Rev 2 www.eaton.com/powerquality
INSTALLATION
Wireway
Terminal Block
Housing
Rear of Rack
13