Removal Of Electrical Box - Daikin Super Multi NX C-Series Service Manual

Super multi nx c-series
Table of Contents

Advertisement

SiE12-411
2.2

Removal of Electrical BOX

Procedure
Step
1. Removing the tie wires
1
The figure shows the tie
pipe connections.
2
Remove the terminal
board fitting screw.
Removal Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Procedure
Electrical box
Electronic expansion
valve coils
Outdoor air thermistor
Gas pipe
Fluid pipes
Terminal board fitting screw
B port
A port
D port
C port
Wiring fixture
Outdoor Unit (50 / 52 / 58 / 68 / 75 Class)
Service monitor PCB
A port
B port
C port
D port
" Remove the piping in the
backward direction.
Service port
" Match the colours of the tie
Power terminal
wires to A, B, C and D ports
board
(L)-White
as follows.
(N)-Black
(1) - Black Power
(2) - White Power
(3) - Red Transmission
" Wires are fixed to the
terminal board with screws.
Earth terminal
" Terminal board is made of
screw
integral moulded resin.
Points
241

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents