Removal Of Electrical Box - Daikin Super Multi NX C-Series Service Manual

Super multi nx c-series
Table of Contents

Advertisement

Outdoor Unit (80 / 90 Class)
1.3

Removal of Electrical Box

Procedure
Step
" Remove the outer panels
such as top and front
panels.
1
The figure shows the
right side view.
1. Remove the tie wire.
1
Loosen the terminal
board screws, and
remove the wires at A
and B ports.
2
Open the terminal
board cover, and
remove the wires at C
and D ports.
220
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Procedure
Power terminal board
(L) - White
PC board for servicing
(N) - Black
A port
B port
C port
D port
Wiring fixture
" Match the colors of the tie
wires to A, B, C and D ports
as follows.
(1) - Black
(2) - White
(3) - Red
" Wires are fixed to the
Earth terminal
terminal board with screws.
screw
" When reassembling,
reconnect the wires to C and
D ports.
Terminal
board cover
SiE12-411
Points
Power
Power
Transmission
Removal Procedure

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents