Mellanox Technologies Grid Director 4036E Installation Manual page 15

High-bandwidth, low-latency scalable grid director
Table of Contents

Advertisement

Grid Director 4036E Installation Manual
To pack the Grid Director 4036E, perform the following steps:
1. Unmount the Grid Director 4036E from the rack.
2. Disassemble the rail brackets and pack the parts in the rail kit box.
3. Insert the Grid Director 4036E into its antistatic bag.
4. Carefully lift the switch, making sure that the bottom of the switch is facing down.
Tip: you can easily identify the bottom of the switch since it has a certification label.
5. Insert the switch into the cardboard box and place it on the bottom foam.
6. Place the top foam on top of the switch.
7. Slide the rail kit box in the dedicated niche alongside of the switch. When sending the
switch for repair without the rail kit, secure it by filling this niche with a filler. This will
protect the switch and prevent it from moving during transportation.
8. Place the Getting Started Guide and the Multipurpose Console Kit (Mng) on top of the top
foam.
9. Place the power cords in the allocated spaces in the foam.
10. Use tape to close the box and verify that the box is securely closed.
Chapter 3
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents