Preparing The Switches - Allied Telesis AT-9424Ts Installation Manual

At-9400ts series
Hide thumbs Also See for AT-9424Ts:
Table of Contents

Advertisement

Chapter 3

Preparing the Switches

The chapter contains the following procedures:
"Powering on a Switch" on page 50
"Starting a Local Management Session" on page 52
"Verifying the AT-S63 Version Number" on page 54
"Updating the AT-S63 Management Software" on page 55
"Assigning the Static Module ID Number 1 to the Master Switch" on
page 56
"Assigning Static Module ID Numbers to the Member Switches" on
page 59
Note
The cables should not be connected to the AT-StackXG Modules
during the procedures in this chapter.
49

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-9424ts/xpAt-9448ts/xp

Table of Contents