Rack-Mount Setup - Avaya S9RM Installation And Operator's Manual

Table of Contents

Advertisement

Rack-Mount Setup

The UPS can be installed in 19- or 23-inch racks and needs only 2U of
valuable rack space.
The UPS and EBM are heavy (see page 56). A minimum of two people are required to lift the
cabinets into the rack.
NOTE Mounting rails are required for each UPS and EBM cabinet. If rails are not already
installed in your rack, contact your local distributor to order rail kits.
To install the UPS and optional EBMs in a rack:
1.
Place the UPS on a flat, stable surface with the front of the UPS
facing toward you.
2.
Attach the supplied mounting handles to the mounting brackets and
secure with the supplied screws (see Figure 5).
3.
Align the mounting brackets with the screw holes on the sides of
the UPS and secure with the supplied screws (see Figure 5).
4.
If installing optional EBMs, repeat Steps 1 through 3 for each
cabinet.
Mounting
Handle
Figure 5. Installing the Mounting Handles and Brackets
t
Avaya
S9RM UPS Site Preparation, Installation and Operator's Manual
C A U T I O N
Mounting
Bracket
S
05147387 Rev C
INSTALLATION
21

Advertisement

Table of Contents
loading

Table of Contents