UPS MAINTENANCE

Testing New Batteries

NOTE The batteries must be fully charged and the UPS must not be in Battery mode to
perform the self-test.
NOTE Load must be applied to the UPS to perform the battery test. Apply the following
load amounts according to the UPS rating: 50% load for 700 VA; 35% load for 1000 VA; 38%
load for 1500 VA; or 25% load for 2000 VA.
Press and hold the
After the test is complete, the
few seconds to turn off). If the
the battery connections. Call your Avaya service representative if the
problem persists.

Recycling the Used Battery or UPS

Contact your local recycling or hazardous waste center for information
on proper disposal of the used battery or UPS.
S
S
Do not discard the UPS or the UPS batteries in the trash. This product contains sealed,
lead-acid batteries and must be disposed of properly. For more information, contact your
local recycling/reuse or hazardous waste center.
Do not discard waste electrical or electronic equipment (WEEE) in the trash. For proper
disposal, contact your local recycling/reuse or hazardous waste center.
54
t
Avaya
S9RM UPS Site Preparation, Installation and Operator's Manual
button for three seconds to initiate a self-test.
Do not dispose of the battery or batteries in a fire. Batteries may explode. Proper
disposal of batteries is required. Refer to your local codes for disposal requirements.
Do not open or mutilate the battery or batteries. Released electrolyte is harmful to the
skin and eyes. It may be toxic.
indicator should turn off (it may take a
indicator continues to flash, check
W A R N I N G
C A U T I O N
C A U T I O N
S
05147387 Rev C

Advertisement

Table of Contents
loading

Table of Contents