Section 5. Operating Instructions; Using The Front Panel Controls - Jandy PureLink Installation And Operation Manual

Water purification system power center and cell kit
Hide thumbs Also See for PureLink:
Table of Contents

Advertisement

Page 26

Section 5. Operating Instructions

NOTE The AquaPure Control Panel is located inside the AquaLink RS PureLink Power Center. To access the
AquaPure Control Panel at the Power Center, open the door to the Power Center. On the Control Access
Panel, remove the two screws that are marked Access to AquaPure PCB. Please note that the AquaLink RS
PCB is mounted on the Control Access Panel. Carefully, lower the Control Access Panel until the hinged tabs
stop. The Control Access Panel will be parallel to the deck.
Boost - 24 Hour 100% Chlorine Production Cycle - Refer to Manual
- - - - To Enter Boost Mode Press and Hold "Temperature" Button for 10 Seconds
Pool Temperature - Temperature of Pool Water at Flow Sensor
CELL ON - Making Chlorine
CELL RESTING - Off Portion of Chlorine Production Cycle
FLOW - Water Flow Present
CELL REVERSING - Automatic Cleaning Cycle in Progress
ADD SALT - Salinity Should be 3.0 - 3.5 Grams / Liter
SERVICE - Refer to Manual -
- - - - To Silence Audible Service Alarm Press and Hold "Salinity" Button for 5 Seconds
Figure 16.
Control Center Front Panel

5.1 Using the Front Panel Controls

Chlorine Production Rate
(more or less) Adjustment
Salinity
Boost
Temperature
CELL ON
CELL RESTING
FLOW
CELL REVERSING
ADD SALT
SERVICE
Power On
Adjustments to the chlorine production rate must be made from the
AquaLink RS control panel.
Press the Salinity button C to check the salinity of the water in pool.
Boost can be activated from the AquaPure PCB while connected to an
AquaLink RS. Press and hold the Temperature button D for 10 seconds
to enter the Boost mode (Note 'bo' will flash intermittently). Boost can
be used to set chlorine production to maximum (100%) for 24 hours of
operation. After 24 hours of chlorinator run time, chlorine production
will return to previous setting. To clear the Boost mode, press and hold
the Temperature button again for 10 seconds.
Press the
Temperature
Temperature measurements can be displayed in either Fahrenheit or
Celsius. For more information, see Section 8, Temperature Conversion.
CHLORINE
PRODUCTION RATE
Rate
Salinity
button
to check the pool water temperature.
D
Rate
Pool Temp.
- Boost -

Advertisement

Table of Contents
loading

Table of Contents