Do not operate the electrolytic cell without water circulation. A buildup of flammable gases will result
in hazardous conditions.
Sometimes
Not Covered
From Pump
Flow Sensor Face
Flow Sensor Face
Must Be
Must Be
Clean
Clean
Figure 12.
Flow/Temp/Salinity Sensor
Figure 13.
Cell Installation
2" x 2" x 1½"
PVC Tee
Figure 14.
Pipe Cutout
Connector
DC Cord Plug is Connected
2" x 2" x 1½"
PVC TEE
PVC Unions and 2" Nuts
For a 2" pipe, the cutout is 2¼"
for the Tee.
For a 50 mm pipe, the cutout is
77 mm for the Tee.
NOTE Total length of the PVC
Tee is 4¾".
WARNING
2" x 2" x 1-1/2 "
PVC TEE
Teflon
Tape
Flow
/ Temp
/ Sal nity
i
Sensor
to Terminal Studs
PVC Union
For a 2" pipe, the cutout is 13
unions, without the Tee.
For a 50 mm pipe, the cutout is 337 mm with the
full unions, without the Tee.
NOTE Total length of the electrolytic cell with the
full unions is 15
2" PVC Union
Detail A
Preferred
Cell
Detail B
Not Preferred
Detail C
Hazardous
O-Ring
Seal
2" PVC Union
and 2" Nut
1
/
" with the full
8
5
/
".
8

Advertisement

Table of Contents
loading

Table of Contents